This was one of the more challenging tours for us as some dates were back to back. We had over 160 channels of microphones on stage to accommodate for the 30-piece orchestra and the main band. The lighting and LED video wall was heavily specified with over 300 lighting fixtures and 350 panels of Video Wall.
Arijit Singh 2016
Posted in